24/7 emergency line · +1 (647) 514-9501 · trucks rolling in under 90 minutes

Portfolio · 59 projects

Work you can walk through.

Every project below was built by our own crews — most of them within fifteen minutes of our London shop. Ask us on your walkthrough and we'll connect you with the homeowners.

Finished kitchen renovation in London OntarioFinished bathroom remodel with tiled walk-in showerWhole-home renovation in progressFinished basement family room with oak flooringRenovated home exterior with new siding and windowsCommercial clinic fit-out completed by Ronin Inc.

Showing 59 of 59 projects

Old North, London

Walnut & Marble Kitchen

Full gut, structural opening, custom millwork

The homeowner's grandmother's tile backsplash was salvaged tile-by-tile and reset above the range. Took two extra days. Worth it.

7 weeksKitchen · 2025

Wortley Village, London

Wortley Century Semi Revival

Whole-home gut, heritage trim replication

We milled 240 feet of baseboard to match a single surviving 1901 profile found behind a radiator.

6 monthsWhole home · 2025

Masonville, London

Spa Primary Bath

Curbless wet room, heated floor, brass fixtures

Client is 6'6". We raised the rain head to 8'2" and moved the niche up with it.

4 weeksBathroom · 2025

Byron, London

Byron Hillside Addition

Two-storey rear addition, steel beam, new envelope

Built on a slope nobody wanted to touch. Engineered piers, and the new floor is dead level with the 1978 original.

5 monthsAddition · 2024

White Oaks, London

Legal Basement Suite

Underpinning, egress, kitchenette, fire separation

The owner's mother moved in three days after handover. We installed the grab bars before she arrived, no charge.

11 weeksBasement · 2025

Oakridge, London

Oakridge Family Kitchen

Wall removal, island seating for six, pantry build

Four kids, so we spec'd a quartz with zero etching and put outlets in the island for homework.

6 weeksKitchen · 2025

Hyde Park, London

Hyde Park New Build Finish

Interior finishing package, stairs, millwork

Their builder walked off. We picked up a half-finished house and finished it in nine weeks.

9 weeksWhole home · 2024

Riverbend, London

Riverbend Heat Pump Retrofit

Cold-climate heat pump, panel upgrade, air sealing

Bills dropped 41% the first winter. We filed all the rebate paperwork for them.

2 weeksSystems · 2025

Westmount, London

Westmount Accessible Main Floor

Roll-in shower, widened doors, main-floor bedroom

Designed with their OT. Dad came home from rehab to a house he could actually use.

5 weeksAccessibility · 2025

Woodfield, London

Woodfield Heritage Kitchen

Heritage-approved kitchen, plaster restoration

Heritage committee approved on the first submission — rare, and we're still smug about it.

8 weeksKitchen · 2024

Sunningdale, London

Sunningdale Executive Bath Suite

Freestanding tub, double wet room, steam

The steam generator hides in the closet behind a magnetic panel the client can open with one hand.

6 weeksBathroom · 2025

Lambeth, London

Lambeth Farmhouse Restoration

Structural repair, new envelope, kitchen, 3 baths

Found a 130-year-old signature on a stud. We framed it into the pantry wall behind glass.

7 monthsWhole home · 2024

Talbot Village, London

Talbot Village Basement Theatre

Soundproofed theatre, bar, 3-piece bath

Double-stud wall and green glue. You can run a saw upstairs during a movie and not hear it.

10 weeksBasement · 2025

Stoneybrook, London

Stoneybrook Deck & Outdoor Kitchen

Composite deck, stone bar, pergola, lighting

The grill sits exactly where the client's old picnic table was. That was the whole brief.

5 weeksOutdoor · 2025

Northridge, London

Northridge Roof & Siding

Full re-roof, fascia, board-and-batten siding

Hail claim. We beat the adjuster's timeline by nine days and matched the neighbour's colour on request.

3 weeksExterior · 2024

Pond Mills, London

Pond Mills Rental Duplex Conversion

Legal duplex, two kitchens, fire separation

First-time landlord. We walked her through every inspection personally so she'd know what to expect next time.

14 weeksBasement · 2025

Glen Cairn, London

Glen Cairn Post-Fire Rebuild

Structural rebuild, full interior, insurance scope

We rebuilt the son's bedroom first so the family had one finished room to visit. It mattered.

5 monthsRestoration · 2024

Old South, London

Old South Kitchen & Butler's Pantry

Kitchen gut, butler's pantry, mudroom lockers

Six lockers, one per family member, each labelled with a brass plate we had engraved locally.

9 weeksKitchen · 2025

Fanshawe, London

Fanshawe Student House Turnover

5-bedroom refresh, 2 baths, flooring, paint

April 28 to May 1 window. Done with a day to spare and the landlord rebooked us on the spot.

3 weeksCorporate · 2025

Medway, London

Medway Ravine Sunroom

Four-season sunroom, heated floor, glazing

Glass spec'd for the deer that walk the ravine at dusk — the whole point of the room.

7 weeksAddition · 2024

Southcrest, London

Southcrest Bungalow Gut

Full gut, rewire, replumb, open plan

Knob-and-tube everywhere. Removed all of it and the insurance premium dropped the same month.

4 monthsWhole home · 2025

Argyle, London

Argyle Emergency Flood Rebuild

Sewer backup remediation, basement rebuild

Called us at 2am. Extraction gear was running by 3:40am and nothing on the main floor was lost.

8 weeksRestoration · 2025

Kensal Park, London

Kensal Park Two-Bath Refresh

Main bath and ensuite, new tile and vanities

One bathroom always stayed working. Non-negotiable for a house with teenagers.

4 weeksBathroom · 2024

Broughdale, London

Broughdale Triplex Envelope Repair

Windows, insulation, siding, balcony repair

Tenants stayed in place the entire time. We worked unit by unit on a published schedule.

6 weeksCorporate · 2025

Carling, London

Carling Craftsman Porch Rebuild

Structural porch rebuild, columns, railings

Turned the original tapered columns on our own lathe rather than buy stock ones.

4 weeksExterior · 2024

Uplands, London

Uplands Chef's Kitchen

Pro range, custom hood, dual island

The client cooks Egyptian food for thirty people at Eid. We sized the hood and the fridge for that, not for a magazine.

10 weeksKitchen · 2025

Summerside, London

Summerside Basement In-Law Suite

Suite with kitchen, bath, private entrance

Separate entrance sited so his parents keep their independence without a shared hallway.

9 weeksBasement · 2025

Jackson, London

Jackson Smart Home Retrofit

Smart panel, lighting control, leak sensors

Auto water shutoff paid for itself four months later when a washer hose let go.

2 weeksSystems · 2025

Bostwick, London

Bostwick New-Build Basement

Rec room, gym, 3-piece bath, wet bar

Rubber gym floor over a floating subfloor — deadlifts don't shake the dining room above.

8 weeksBasement · 2024

Highland, London

Highland Whole-Home Modernization

Gut, addition, kitchen, 3 baths, exterior

Weekly Saturday walkthroughs with coffee. They kept coming even after we finished.

8 monthsWhole home · 2024

Cleardale, London

Cleardale Garage & Workshop

Detached garage, heated workshop, EV charger

Insulated to R28 so he can work on the bike in February. He does.

7 weeksExterior · 2025

Blackfriars, London

Blackfriars Bathroom Waterproofing Fix

Failed shower rebuild, joist repair, retile

Someone else's two-year-old shower had rotted the joists. We fixed the framing, not just the tile.

3 weeksBathroom · 2025

Hunt Club, London

Hunt Club Millwork Library

Floor-to-ceiling library, ladder, window seat

Shelf depths were built around her actual books — we measured the collection first.

5 weeksMillwork · 2024

Foxfield, London

Foxfield Duplex Build

Purpose-built duplex interior, two kitchens

Sound separation tested at STC 58. The tenants have never met each other's TVs.

4 monthsWhole home · 2025

Warbler Woods, London

Warbler Woods Primary Suite

Bedroom addition, ensuite, walk-in closet

Cantilevered the closet over the deck to save three mature maples the client refused to lose.

12 weeksAddition · 2024

Sherwood Forest, London

Sherwood Forest Kitchen Refresh

Cabinet refinishing, counters, backsplash

Their cabinets were solid maple. Refinishing saved them $19,000 and we told them so.

2 weeksKitchen · 2025

Tempo, London

Tempo Townhome Flip Package

Flooring, paint, kitchen, bath, lighting

Sold over asking in six days. We got a referral to the buyer's own renovation.

5 weeksCorporate · 2025

Huron Heights, London

Huron Heights Roof Emergency

Storm tarping, re-roof, ceiling rebuild

Tarped in the dark during the storm, re-roofed the next week, and never charged for the tarp.

4 weeksRestoration · 2024

Old North, London

Old North Attic Conversion

Dormer, bedroom, 3-piece bath, stair rebuild

The dormer window frames the same tree the client climbed as a kid in that house.

14 weeksAddition · 2025

Byron, London

Byron Pool House

Pool house, change room, outdoor shower

Cedar interior. Smells incredible in August and that was entirely intentional.

8 weeksOutdoor · 2024

Masonville, London

Masonville Condo Full Reno

Kitchen, two baths, flooring, closets

Elevator bookings, quiet hours, and we still finished four days early.

7 weeksWhole home · 2025

Riverbend, London

Riverbend Aging-in-Place Package

Zero-threshold bath, ramp, lever hardware

She's 84 and stayed in the house. That's the whole scorecard for us.

4 weeksAccessibility · 2025

Oakridge, London

Oakridge Rot & Structural Repair

Sill plate replacement, jacking, siding

Two other companies said 'tear it down'. It didn't need to come down.

5 weeksRepairs · 2024

Wortley Village, London

Wortley Village Coffee Shop

Café buildout, counters, washroom, exhaust

Opened on the day printed on their pre-sold gift cards. No excuses were available.

9 weeksCorporate · 2025

White Oaks, London

White Oaks Clinic Fit-Out

Physio clinic, 6 treatment rooms, AODA washroom

Nights and Sundays only — the clinic never lost a single billable day.

10 weeksCorporate · 2024

Uptown Waterloo

Uptown Waterloo Dental Fit-Out

5 operatories, lead-lined x-ray, sterilization

Built around the doctor's exact instrument workflow, drawn on a napkin at the first meeting.

12 weeksCorporate · 2025

Beechwood, Waterloo

Beechwood Kitchen & Great Room

Wall removal, steel beam, kitchen, fireplace

The beam went in on the coldest day of the year and the crew still took their boots off inside.

9 weeksKitchen · 2025

Doon South, Kitchener

Doon South Basement Suite

Legal suite, egress, kitchenette, separate entry

Their first rental income arrived nineteen days after handover.

10 weeksBasement · 2024

Victoria Park, Kitchener

Victoria Park Century Home Gut

Whole-home gut, rewire, 3 baths, kitchen

Restored the original newel post instead of replacing it. Three weekends of stripping by hand.

7 monthsWhole home · 2025

Laurelwood, Waterloo

Laurelwood Spa Ensuite

Wet room, soaker tub, heated floor, sauna

The cedar sauna was built on site because the prefab wouldn't clear the stairwell.

7 weeksBathroom · 2025

Eastbridge, Waterloo

Eastbridge Rear Addition

Family room addition, mudroom, powder room

Dog wash station in the mudroom — added mid-project after we met the dog.

16 weeksAddition · 2024

Westmount, Kitchener

Westmount Kitchener Roof & Windows

Re-roof, 14 triple-pane windows, air sealing

Blower-door tested before and after: 38% tighter. We left the report on the counter.

4 weeksExterior · 2025

Huron Park, Kitchener

Huron Park Rental Portfolio Refresh

6 units: flooring, paint, baths, appliances

Two units at a time so the owner never lost more than a third of the rent roll.

8 weeksCorporate · 2025

St. Thomas

St. Thomas Farmhouse Kitchen

Farmhouse kitchen, pantry, reclaimed beams

Beams came from the family's own collapsed barn. We planed and treated every one.

8 weeksKitchen · 2024

Strathroy

Strathroy Whole-Home Renovation

Gut, addition, kitchen, 2 baths, siding

Rural site, no municipal water — we redesigned the mechanical room around their well and cistern.

6 monthsWhole home · 2025

Ilderton

Ilderton Custom Garage Suite

Garden suite above garage, kitchen, bath

Their daughter's first apartment. Mostafa hung the door himself on the last day.

5 monthsAddition · 2025

Komoka

Komoka Riverfront Deck

Multi-level deck, glass rail, outdoor kitchen

Glass railing so the four-year-old could see the river without standing on anything.

6 weeksOutdoor · 2024

Woodstock

Woodstock Retail Buildout

Retail fit-out, storefront, accessible washroom

Franchise standards down to the millimetre, verified by their own inspector on the first pass.

7 weeksCorporate · 2025

Dorchester

Dorchester Insurance Water Rebuild

Full basement rebuild after supply line failure

Adjuster called us afterwards to ask if we'd take more of their files. We did.

9 weeksRestoration · 2024

Client words

What they said afterwards.

"They gutted our kitchen and main floor in eleven weeks and hit the date. The site was cleaner at the end of each day than our house normally is."
Dana & Chris M.Kitchen + main floor, Old North, London
"Two bathrooms, one bad leak nobody else could find. Ronin traced it, fixed the framing underneath and never padded the invoice."
Priya S.Bathroom remodel, Masonville, London
"Pipe burst at 11pm in January. Mostafa answered the phone himself and a truck was in our driveway before midnight. They rebuilt the whole basement after."
Marcus O.Emergency + basement rebuild, Byron, London
"We're on our fourth project with Ronin across two houses. The loyalty pricing is real and so is being first on the calendar."
The Haddad FamilyRepeat client since 2016, Wortley Village
"Forty-two student units turned over between April 28 and May 1. Nobody else in London would even quote it."
K. Bhatt, Property ManagerCorporate turnover program, London
"Our clinic never lost a business day. They worked nights for six weeks and swept the floor before every morning."
Dr. A. NguyenDental fit-out, Uptown Waterloo

Free, no-pressure estimate

Tell us what's broken, dated or too small.

We'll walk the space, price it honestly and give you a schedule you can plan around.